[9] Vinsen, Kevin, Diane Jamieson 和 Guy Callender, "Use Case Estimation -- The Devil is in the Detail",12th IEEE International Requirements Engineering Conference (RE'04), 2004, pp. 10-15。项目管理者联盟
[10] Braz, Marcio Rodrigo 和 Silvia Regina Vergilio, "Software Effort Estimation Based on Use Cases",Proceedings of the 30th Annual International Computer Software and Applications Conference (COMPSAC '06),2006, pp. 221-228。talent.mypm.net
[11] Diev, Sergey, "Use cases modeling and software estimation: Applying Use Case Points",ACM Software Engineering Notes, Volume 31, Number 6, 2006 年 11 月。项目管理者联盟文章
[12] Anda, Bente, Endre Angelvik 和 Kirsten Ribu, "Improving Estimation Practices by Applying Use Case Models",Profes 2002, LNCS 2259, pp. 383-397。项目管理者联盟
[13] Bittner, Kurt, 和 Ian Spence,Use Caseuse case Modeling. Pearson Education 2003。talent.mypm.net
[14] Kusumoto, Shinji 等, "Estimating Effort by Use Case Points: Method, Tool and Case Study",Proceedings of the 10 th International Symposium on Software Metrics (METRICS'04), 2004.pmp.mypm.net
[15] Koirala, Shivprasad, "How to Prepare Quotation Using Use Case Points", The Code Project, 2004 年 12 月项目管理者联盟
[16] Probasco, Leslee, "Dear Dr. Use Case: What About Function Points and Use Cases?",The Rational Edge, 2002 年 8 月项目管理者联盟 项目管理者联盟
|