f. study variations in engineering with QA/QC Office, and submit to the Engineering Manager for approval.PgMp.mypm.net
3.2.2 Control Office转自项目管理者联盟
The Control Office shall:www.mypm.net
a. bear the responsibilities for working out detailed design plan for project under the supervision of Project Control Department.项目管理者联盟
b. check, supervise and coordinate the implementation of the detailed design plan.转自项目管理者联盟
c. be responsible for issuing weekly progress reports and monthly progress reports, and submit to Project Control Department on time.blog.mypm.net
d. make suitable adjustment to the design plans, and submit the outcome of adjustment to Project Control Department in time after the approval of the engineering. 3.2.3 Administration OfficePgMp.mypm.net
The Administration Office is responsible for: a. administration of internal and external documents, drawings, engineering documents and letters of the department, including receiving and distribution documents. b. translating, issuing and submitting works of engineering documents. c. management and maintenance of computer system, installation and maintenance of basic software and management of computer instructions and documents. d. secretary works during entire engineering under the direction of project Administration Department. e. office works and routines of Engineering Department. 3.2.4 QA/QC Office项目管理者联盟
The QA/QC Office: a. performs routine reviews of engineering design output documents, which are considered as “Self Quality Checks” of the Engineering Department.项目管理培训
b. is responsible for organization, coordination and verification of implementation and execution of the quality system on behalf of the Engineering Manager.项目管理培训
c. is responsible for the organization, coordination, revision, explanation, issuing and management of development of procedures and job instructions under the supervision of the QA/QC Department, and responsible for the distributed documents with effect.项目管理者联盟
d. is responsible for quality control during entire engineering, and giving preliminary direction, interim examination and evaluation of final results.项目管理者联盟
e. is responsible for quality analysis and collection, handling, transmitting and feedback of quality related information.training.mypm.net
f. has the authority for the quality of all design output document of Engineering Department.项目管理者联盟
[0] 3.2.5 Field/Local Office项目管理者联盟
Engineering Department will, in accordance with the needs of the field activities and construction schedule, mobilize various discipline engineers to the field for construction support. The construction support engineering’s responsibility and procedures are detailed in procedure EDP-016 of this manual.项目经理圈子
4.0 REFERENCES • EDP-016 Construction Support Engineering 5.0 EXHIBITS • Exhibit 001-1 Organization Chart of Engineering Department.项目管理者联盟