5.3.3 Create WBS: Outputs 2 Work Breakdown Structure
The key document generated by the Create WBS process is the actual WBS. Each WBS component, including work package and control accounts within a WBS, is generally assigned a unique identifier from a code of accounts. "These identifiers provide a structure for hierarchical summation of costs, schedule, and resource information. "
最后这句话,是想说明什么呢,是说wbs分解完后可以产生进度计划?
创建工作分解结构的过程可以产生什么? A 项目进度计划 B 小组外购 C 项目完工日期 D 风险清单