本人正在测试Project Server2007。Project Server 2007 与Project Server 2003相比对硬件、软件的要求有所不同。
Hardware requirements
|
Dependency |
Requirement |
|
Processor |
Pentium III - 500 megahertz (MHz) or faster |
|
Memory |
512 megabyte (MB) minimum, 1 gigabyte (GB) recommended |
|
Hard disk |
200 MB of available space |
|
Display |
SVGA (800 x 600) or higher |
|
Network connection |
10 MB or higher connection |
|
DVD player |
For installation media |
Software requirements
|
Dependency |
Requirement |
Optional |
|
Operating system |
Either of the following: · Microsoft Windows Server 2003 Standard Edition, with SP1 or later (32 or 64-bit) · Windows Server 2003 Enterprise Edition SP1 or later (32 or 64-bit) |
|
|
Database server |
Either of the following: · Microsoft SQL Server 2000 SP4 or later · SQL Server 2005 (32-bit Intel or AMD processor) Note For the Beta 2 release, the Analysis Services 2005 integration will not work with Office Project Server 2007 |
· SQL Server Analysis Services · SQL Server Reporting Services Note The SQL Server Analysis Services and SQL Server Reporting Services versions should be matched with the SQL Server version. |
|
Windows SharePoint Services version 3 |
Version 3.0 or later. Note You do not need to install Windows SharePoint Services version 3 prior to installing Office Project Server 2007. Windows SharePoint Services version 3 is installed with the Office Project Server 2007installation. Windows SharePoint Services version 3 also is not required on the database server in a two-computer small farm configuration. |
|
|
.NET Framework |
Version 2.0.50727 or later Note Not required on the database server in a two-computer small farm configuration. |
|
|
ASP.NET |
Version 2.0.50727 or later Note Not required on the database server in a two-computer small farm configuration. |
ASP.NET should be updated automatically when the .NET Framework is updated, as long as IIS is enabled on the computer. You can check the version that you have by starting Internet Information Services Manager and going to the Web Services Extensions folder. |
|
Windows Workflow Foundation component |
Beta 2.2 or later (version 3.0.3807.7) |
|
|
Other |
|
If you need to send e-mail notification, you need a Simple Mail Transfer Protocol (SMTP) Server. If you need to receive e-mail notifications, you need a mail client that can receive the mail via the SMTP Server, such as:. · Post Office Protocol 3 (POP 3) · Internet Message Access Protocol 4 (IMAP4) · Microsoft Messaging Application Programming Interface (MAPI)–compliant messaging software |