Calendar
Placard
Category
Latest Entries
Latest Comments
Last Messages
User Login
Links
Information
Search
Other
他山之石 华山一路!
  CMMI v1.2关键关注点
 

Version 1.2 of the CMMI Product Suite is planned for release in August of 2006 and, although the changes are not extensive, this new release will include the following:
Model Improvements

1.incorporating a model architecture that accommodates the expansion of best practices into new areas (e.g., services, acquisition)
2.releasing CMMI in a single-book format that reflects both the staged and continuous representations 
3.eliminating the concepts of advanced practices and common features
4.simplifying the integrated product and process development (IPPD) material 
5.incorporating the supplier sourcing (SS) extension into the base model 
6.adding hardware-related examples

SCAMPI Appraisal Method Improvements
1.removing the requirement for instruments (e.g., surveys)
2.adding guidance on how to characterize alternative practices 
3.setting limits for the maximum length of appraisals
4.defining requirements for sampling and incremental appraisals
5.expanding the scope of readiness reviews to include the readiness of the organization, the team, and logistics
6.requiring the appraisal sponsor's signature on the Appraisal Disclosure Statement
7.limiting the validity of appraisal results to a maximum of three years

[ 阅读全文 | 回复(0) | 引用通告 | 编辑 | 收藏该日志

  Post  by  项目管理及过程改进 发表于 2006/4/7 15:40:00

发表评论:

    昵称:
    密码:
    主页:
    标题: